S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
43. The authorization holder must, at least 24 hours before, notify the Minister of the work completion date. If the geophysical surveying work is temporarily interrupted, the holder must also, as soon as possible, notify the Minister of the work resumption date.
O.C. 1251-2018, s. 43.
In force: 2018-09-20
43. The authorization holder must, at least 24 hours before, notify the Minister of the work completion date. If the geophysical surveying work is temporarily interrupted, the holder must also, as soon as possible, notify the Minister of the work resumption date.
O.C. 1251-2018, s. 43.